Skip to main content

Functional mobility goals, tracked the way a school-based PT works.

You address gross motor development, functional mobility, positioning, and safe participation in the school environment. Osprey gives you goal structures and data collection methods designed for the school-based PT — not a clinic outpatient charting system.

Gross motor milestones with functional anchors.

Track stair negotiation, gait quality, balance, ball skills, and playground participation with rubric-based scoring. Each goal ties to a functional outcome the IEP team can observe, not a goniometric measurement only a PT would interpret.

Mobility and positioning documentation.

Record wheelchair positioning checks, adaptive-equipment use, and safe-transfer protocols. Osprey keeps the equipment log tied to the student's profile so every team member knows the current setup.

Data collection that fits a gym or hallway session.

Mobile-first tap recording for timed trials, distance measures, and functional-task completion. Collect data during the session, not from memory at the end of the day.

Collaboration with classroom teams.

When the PT recommends movement breaks, positioning changes, or environmental modifications, Osprey documents the recommendation and tracks implementation across settings.

PT workflow

Functional mobility goals, tracked the way a school-based PT works.

Functional-mobility session → mobility progress with assistance fading.

Osprey PT dashboard showing the physical therapy caseload and sessions.

Your students and sessions, school-day ready

Caseload and session schedule organized around the school day — hallway mobility, gym sessions, and classroom consults.

Functional-mobility session for Maya Torres recording hallway walking distance and assistance level.

Distance and assistance level for navigating the school

Log walking distance and assistance level during functional-mobility sessions in hallways and common areas.

Progress chart for Maya Torres' hallway walking rising 100, 130, 145 feet toward a 150-foot criterion with decreasing assistance.

Functional-mobility progress toward an educational-access goal

Feet walked and assistance faded session over session toward the distance criterion on the IEP.

PT metrics tabs summarizing functional mobility, balance, and endurance outcomes.

School-based PT outcomes tied to access and participation

Mobility, balance, and endurance metrics aggregated for the access-and-participation outcomes districts track.

Get Osprey as a PT.

Download the app or try the live demo shaped for physical therapy workflows.

Get product updates