Skip to main content

Behavior analysis software that thinks like a BCBA.

You design behavior-change programs, supervise RBTs, run preference assessments, and write treatment plans that satisfy insurance and parents. Osprey gives you a workspace shaped by ABA methodology — not a spreadsheet with a clinical skin.

Skill-acquisition and behavior-reduction in one place.

DTT, NET, and task-analysis programs sit next to functional behavior data. Prompt hierarchies, mastery criteria, and generalization targets are part of the program structure, not afterthoughts in a notes field.

Live trial-by-trial data collection.

Tap correct, incorrect, or prompted during the session. Osprey scores per-target accuracy, tracks prompt-level fading, and flags stalled programs before the next supervision meeting.

FBA/BIP loop, closed.

ABC data collection during sessions feeds the descriptive analysis. Scatter plots and conditional-probability tables surface patterns. The BIP references the same data source the FBA used — no copy-paste across documents.

RBT oversight built into the session.

Assign programs to RBTs, review their session data, co-sign notes, and attach supervisory feedback — all inside the session record, not in a separate supervision-tracking tool.

BCBA workflow

Behavior analysis software that thinks like a BCBA.

Program caseload → trial-level DTT collection → prompt-fading mastery story for Client Sofia Reyes.

Osprey BCBA dashboard listing a caseload of clients and their active behavior programs.

Your clients and programs in one workspace.

Caseload, active programs, and session readiness in one dashboard — no spreadsheet stitching.

Discrete-trial data collection for Sofia Reyes' motor imitation program, showing per-trial scoring and prompt level for ten trials.

Trial-level DTT with prompt level on every trial

Each trial captures accuracy and prompt level so fading decisions are backed by session data, not recall.

Goal progress chart for Sofia Reyes showing independent responding rising 20, 50, 70 percent across three sessions toward an 80-percent mastery criterion.

Independence progress against a stated mastery criterion

Session-over-session independence percentages plotted against the mastery criterion you set for the program.

ABA metrics tab summarizing mastery and independence trends across the BCBA's caseload.

Caseload-level mastery trends at a glance

ABA metrics roll up mastery and independence across your full caseload without a separate analytics export.

Get Osprey as a BCBA.

Download the app or try the live demo shaped for behavior analysis workflows.

Get product updates